List view
All work items related to productizing and shipping cable-gen tooling to visualize and cable arbitrary topologies up to multiple BH Superpods.
Due by March 31, 2026Performance workitems scheduled for large LLM inference. Includes low-latency work for low-latency decode and other miscelaneous optimizations to bump up 2D perf to near linear fabric levels.
Due by February 13, 2026- Due by December 31, 2025•2/2 issues closed
- Due by January 15, 2026•13/13 issues closed
- Due by April 9, 2025•12/12 issues closed
This is the initial phase of the project for setting up needed infrastructure. At the end of this milestone, there should be a clear way forward on where and how to implement data movement test for testing their functionality and performance.
Due by March 31, 2025•7/7 issues closedWe need to be able to build tt-metal without passing ARCH_NAME. Architecture can be detected at runtime by the software. Currently much of the code takes advantage of knowing the architecture at compile time. We need to make use of the Hal to abstract away information that can be queried at runtime. Currently any host code that includes the following files is ARCH_NAME dependent: - dev_mem_map.h - eth_l1_address_map.h - noc_parameters.h - noc_overlay_parameters.h - tensix.h - tensix_types.h Any other file in tt_metal/hw/inc/ARCH_NAME
Due by January 31, 2025•94/94 issues closed- No due date
- Due by November 10, 2023•1/1 issues closed
- Due by June 20, 2023•10/10 issues closed
Getting WH up on tt-metal tests + FP32 accumulation
Due by June 23, 2023•27/27 issues closed