feat: migrate from poetry to uv #2092
ci.yml
on: pull_request
Matrix: test
Finish Coveralls
0s
Annotations
9 errors
|
test (3.9)
Process completed with exit code 1.
|
|
test (3.11)
The operation was canceled.
|
|
test (3.11)
The strategy configuration was canceled because "test._3_9" failed
|
|
test (3.10)
The operation was canceled.
|
|
test (3.10)
The strategy configuration was canceled because "test._3_9" failed
|
|
test (3.13)
The operation was canceled.
|
|
test (3.13)
The strategy configuration was canceled because "test._3_9" failed
|
|
test (3.12)
The operation was canceled.
|
|
test (3.12)
The strategy configuration was canceled because "test._3_9" failed
|