Skip to content

Configure Renovate - #10

Open
renovate[bot] wants to merge 1 commit into
mainfrom
renovate/configure
Open

renovate[bot] wants to merge 1 commit into
mainfrom
renovate/configure

Conversation

@renovate

@renovate renovate Bot commented Nov 22, 2026

Copy link
Copy Markdown

Welcome to Renovate! This is an onboarding PR to help you understand and configure settings before regular Pull Requests begin.

🚦 To activate Renovate, merge this Pull Request. To disable Renovate, simply close this Pull Request unmerged.

📚 See our Reading List for relevant documentation you may be interested in reading.

🔡 Do you want to change how Renovate upgrades your dependencies? Add your custom config to renovate.json in this branch. Renovate will update the Pull Request description the next time it runs.


Detected Package Files

  • .github/actions/setup/action.yml (github-actions)
  • .github/workflows/ci.yml (github-actions)
  • .github/workflows/codeql.yml (github-actions)
  • .github/workflows/scorecard.yml (github-actions)
  • gradle.properties (gradle)
  • settings.gradle.kts (gradle)
  • gradle/libs.versions.toml (gradle)
  • build.gradle.kts (gradle)
  • app/build.gradle.kts (gradle)
  • gradle/wrapper/gradle-wrapper.properties (gradle-wrapper)

Configuration Summary

Based on the default config's presets, Renovate will:

  • Start dependency updates only once this onboarding PR is merged
  • Hopefully safe environment variables to allow users to configure.
  • Show all Merge Confidence badges for pull requests.
  • Enable Renovate Dependency Dashboard creation.
  • Use semantic commit type fix for dependencies and chore for all others if semantic commits are in use.
  • Ignore node_modules, bower_components, vendor and various test/tests (except for nuget) directories.
  • Group known monorepo packages together.
  • Use curated list of recommended non-monorepo package groupings.
  • Show only the Age and Confidence Merge Confidence badges for pull requests.
  • Apply crowd-sourced package replacement rules.
  • Apply crowd-sourced workarounds for known problems with packages.
  • Update vulnerable PHP runtime pins for CVE-2026-109618 and CVE-2026-109619.
  • Ensure that every dependency pinned by digest and sourced from Forgejo contains a link to the commit-to-commit diff
  • Ensure that every dependency pinned by digest and sourced from Gitea contains a link to the commit-to-commit diff
  • Ensure that every dependency pinned by digest and sourced from GitHub.com and Github enterprise contains a link to the commit-to-commit diff
  • Ensure that every dependency pinned by digest and sourced from GitLab.com contains a link to the commit-to-commit diff
  • Correctly link to the source code for golang.org/x packages
  • Link to pkg.go.dev/... for golang.org/x packages' title
  • Provide a link to octochangelog's improved breakdown for Renovate's changelogs

What to Expect

With your current configuration, Renovate will create 10 Pull Requests:

Update github/codeql-action action to v4.39.4
  • Schedule: ["at any time"]
  • Branch name: renovate/github-codeql-action-4.x
  • Merge into: main
  • Upgrade github/codeql-action to 1bd86f2fdb4b86187fa4059f16f31a3202acc9ea
Update gradle/actions action to v6.4.1
  • Schedule: ["at any time"]
  • Branch name: renovate/gradle-actions-6.x
  • Merge into: main
  • Upgrade gradle/actions to 8da46b539cd8fe6ab27ca75128919a18d757604c
Update zizmorcore/zizmor-action action to v0.8.1
  • Schedule: ["at any time"]
  • Branch name: renovate/zizmorcore-zizmor-action-0.x
  • Merge into: main
  • Upgrade zizmorcore/zizmor-action to 45d7276c9ca790aabd705e31ca99c6185c3e76dd
Update actions/setup-java action to v6.3.0
  • Schedule: ["at any time"]
  • Branch name: renovate/actions-setup-java-6.x
  • Merge into: main
  • Upgrade actions/setup-java to d1374f8ac74474200d16ef8ecee22c7ae7a51880
Update dependency com.android.application to v9.5.2
Update dependency org.robolectric:robolectric to v4.18.1
Update ghcr.io/zizmorcore/zizmor Docker tag to v1.32.0
  • Schedule: ["at any time"]
  • Branch name: renovate/ghcr.io-zizmorcore-zizmor-1.x
  • Merge into: main
  • Upgrade ghcr.io/zizmorcore/zizmor to 1.32.0
Update Gradle to v9.9.2
  • Schedule: ["at any time"]
  • Branch name: renovate/gradle-9.x
  • Merge into: main
  • Upgrade gradle to 9.9.2
Update ossf/scorecard-action action to v2.6.0
  • Schedule: ["at any time"]
  • Branch name: renovate/ossf-scorecard-action-2.x
  • Merge into: main
  • Upgrade ossf/scorecard-action to 23f22cd43608bae7a1f1fa2603d7314dee9538a5
Update dependency java-jdk to v25
  • Schedule: ["at any time"]
  • Branch name: renovate/major-java
  • Merge into: main
  • Upgrade java-jdk to 25

🚸 PR creation will be limited to maximum 2 per hour, so it doesn't swamp any CI resources or overwhelm the project. See docs for prHourlyLimit for details.


❓ Got questions? Check out Renovate's Docs, particularly the Getting Started section.
If you need any further assistance then you can also request help here.


This PR was generated by Mend Renovate. View the repository job log.

This branch has not been deployed

No deployments
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

0 participants