Skip to content

Bump version: 0.14.0 → 0.14.1 #122

Bump version: 0.14.0 → 0.14.1

Bump version: 0.14.0 → 0.14.1 #122

Triggered via push April 6, 2025 06:52
Status Failure
Total duration 1m 55s
Artifacts

ci.yml

on: push
Matrix: test
Indicate completion to coveralls.io
0s
Indicate completion to coveralls.io
Fit to window
Zoom out
Zoom in

Annotations

9 errors
test (3.13)
Process completed with exit code 1.
test (3.12)
Process completed with exit code 1.
test (3.12)
The strategy configuration was canceled because "test._3_13" failed
test (3.11)
The operation was canceled.
test (3.11)
The strategy configuration was canceled because "test._3_13" failed
test (3.9)
The operation was canceled.
test (3.9)
The strategy configuration was canceled because "test._3_13" failed
test (3.10)
The operation was canceled.
test (3.10)
The strategy configuration was canceled because "test._3_13" failed