Skip to content

chore: remove coveralls from deps group #153

chore: remove coveralls from deps group

chore: remove coveralls from deps group #153

Triggered via push July 9, 2025 11:37
Status Failure
Total duration 1m 9s
Artifacts

ci.yml

on: push
Matrix: test
Indicate completion to coveralls.io
Indicate completion to coveralls.io
Fit to window
Zoom out
Zoom in

Annotations

11 errors
test (3.13)
Process completed with exit code 2.
test (3.12)
Process completed with exit code 2.
test (3.12)
The strategy configuration was canceled because "test._3_13" failed
test (3.10)
The operation was canceled.
test (3.10)
The strategy configuration was canceled because "test._3_13" failed
test (3.9)
The operation was canceled.
test (3.9)
The strategy configuration was canceled because "test._3_13" failed
test (3.11)
The operation was canceled.
test (3.11)
The strategy configuration was canceled because "test._3_13" failed
test (3.14)
The operation was canceled.
test (3.14)
The strategy configuration was canceled because "test._3_13" failed