Skip to content

cleanup

cleanup #3359

Triggered via push August 19, 2026 13:30
Status Cancelled
Total duration 4m 25s
Artifacts

ci.yml

on: push
Matrix: Static gcc build
Matrix: Pixi gcc-extended-build environment testing
Matrix: Extended testing
Matrix: Test GNU fortran
Matrix: Test Intel fortran
Fit to window
Zoom out
Zoom in

Annotations

8 errors
Pixi gcc-extended-build environment testing (ubuntu-22.04)
Process completed with exit code 1.
Static gcc build (windows-2022)
Canceling since a higher priority waiting request for MODFLOW 6 continuous integration-refs/heads/prt-clamp exists
Static gcc build (windows-2022)
The operation was canceled.
Static gcc build (ubuntu-22.04)
Canceling since a higher priority waiting request for MODFLOW 6 continuous integration-refs/heads/prt-clamp exists
Static gcc build (ubuntu-22.04)
The operation was canceled.
Smoke test
Canceling since a higher priority waiting request for MODFLOW 6 continuous integration-refs/heads/prt-clamp exists
Smoke test
The operation was canceled.
MODFLOW 6 continuous integration
Canceling since a higher priority waiting request for MODFLOW 6 continuous integration-refs/heads/prt-clamp exists