Skip to content

add RoutingPlan

add RoutingPlan #75

Triggered via push July 11, 2025 12:23
Status Failure
Total duration 25s
Artifacts

tests.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

7 errors
build (3.11)
Process completed with exit code 1.
build (3.9)
Process completed with exit code 1.
build (3.9)
The strategy configuration was canceled because "build._3_11" failed
build (3.10)
Process completed with exit code 1.
build (3.10)
The strategy configuration was canceled because "build._3_11" failed
build (3.8)
The operation was canceled.
build (3.8)
The strategy configuration was canceled because "build._3_11" failed