  • Due by March 27, 2020
    30/30 issues closed
  • Create all the components that allow viewing of test set images using CIRRUS Web

    Due by August 31, 2018
    5/5 issues closed
  • No due date
    3/3 issues closed
  • Everything regular users see. Make it clear how to register for the framework, for a challenge, error templates, clear informative emails.

    No due date
    18/18 issues closed
  • Make it as easy as possible to start using the framework.

    No due date
    5/5 issues closed
  • Make webrendering usable. Improve feedback when loading, Make more stable, or at least make it clear when rendering is down. For graphs, extend options to plot csv files, adapt layout

    No due date
    4/4 issues closed
  • Fix embarrassing annoyances like not being redirected back after login. Make it easier to customize a project. Make login status and login screen less alpha V0.1 Have several people try the interface and list their problems/annoyances

    Due by January 14, 2013
    4/4 issues closed
  • No new functionality, just improving the exiting functionality so it can be called finished without hesitation. As proof host the CRASS challenge http://crass.grand-challenge.org/ on the comic framework. CRASS is a very basic project, only pages, downloads and sign up functionality. Hosting this challenge still means a number of existing features need to be improved and polished

    Due by December 1, 2012
    6/6 issues closed
  • Replicate existing challenge site functionality. Existing challenges can now be moved to COMIC. See https://github.com/comic/comic-django/wiki/Implementation-planning

    No due date
    23/23 issues closed
  • Send around http://mirc.uzleuven.be/comic/ to all COMIC members, Have it show a Portal page which is presentable, editable, log in, list of projects (may be mockups)

    Due by June 29, 2012
    3/3 issues closed
  • The next big milestone after an initial release will have the opportunity to upload algorithms and have them run on the server, on the available images. This will lead to a number of challenging technical requirements, but it will also bring *a lot* of new possibilities, e.g. to add new images and re-run all algorithms on those, to try out algorithms on data of one’s own (without necessarily publishing the data or the results), or uploading evaluation algorithms, for instance.

    No due date
    1/1 issues closed
  • Basic website up and running Or more practically: Have an overview page which lists sites, sites are like this: http://crass.grand-challenge.org/

    Due by August 1, 2012
    14/14 issues closed
  • The first version of comic we want to go public with. Is functional and looks correct from the outside. Inside, the admin interface is usable but need not be totally streamlined. For admin, we do not need blogger-like security and hack-proofness yet. People with admin rights can be anyone in the consortium and trusted others. see https://github.com/comic/comic-django/wiki/Implementation-planning

    Due by October 10, 2012