Skip to content

Update source link and fix CI issues #129

Update source link and fix CI issues

Update source link and fix CI issues #129

Re-run triggered November 11, 2024 15:08
Status Failure
Total duration 41m 38s
Artifacts 3

integration_test.yaml

on: pull_request
integration-tests  /  Plan
6s
integration-tests / Plan
Matrix: integration-tests / build
Matrix: integration-tests / Integration tests / Integration tests
integration-tests  /  Plan Image Scanning
5s
integration-tests / Plan Image Scanning
integration-tests  /  Required Integration Test Status Checks
integration-tests / Required Integration Test Status Checks
Matrix: integration-tests / scan
Fit to window
Zoom out
Zoom in

Annotations

4 errors
integration-tests / Integration tests / Integration tests
Process completed with exit code 1.
integration-tests / Integration tests / Integration tests
The action 'Tmate debugging session (gh-hosted)' has timed out after 30 minutes.
integration-tests / Required Integration Test Status Checks
Process completed with exit code 1.