-
Notifications
You must be signed in to change notification settings - Fork 4.6k
ECAL Phase 2 - Upgrades for Phase 2 development workflow, validation and DQM #49409
New issue
Have a question about this project? Sign up for a free GitHub account to open an issue and contact its maintainers and the community.
By clicking “Sign up for GitHub”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.
Already on GitHub? Sign in to your account
Conversation
|
cms-bot internal usage |
|
type ecal |
|
+code-checks Logs: https://cmssdt.cern.ch/SDT/code-checks/cms-sw-PR-49409/46864
|
|
A new Pull Request was created by @thomreis for master. It involves the following packages:
@AdrianoDee, @DickyChant, @antoniovagnerini, @civanch, @cmsbuild, @ctarricone, @davidlange6, @fabiocos, @ftenchini, @gabrielmscampos, @jfernan2, @kpedro88, @mandrenguyen, @mdhildreth, @miquork, @nothingface0, @rseidita, @srimanob can you please review it and eventually sign? Thanks. cms-bot commands are listed here |
|
please test |
|
+1 Size: This PR adds an extra 260KB to repository Comparison SummarySummary:
|
|
+1 |
|
+1 |
|
Naive question: does this affect online DQM as well? I cannot clearly tell from the files touched. |
We did not change the online DQM configuration so the Run 3 one should not be changed. |
|
+pdmv |
Thanks!
Not that I know of! |
|
+dqm |
|
This pull request is fully signed and it will be integrated in one of the next master IBs (tests are also fine). This pull request will now be reviewed by the release team before it's merged. @mandrenguyen, @ftenchini, @sextonkennedy (and backports should be raised in the release meeting by the corresponding L2) |
|
+1 |
PR description:
This PR removes legacy modules from the ECAL Phase 2 development workflows and updates the validation to work without endcaps and preshower collections. The workflows also use the proper Phase 2 pulse shape obtained from 2018 TB data.
The
EcalLazyClusterToolswere updated to make an EE input collection optional.ECAL DQM tasks and clients not needed for Phase 2 are removed from the workflow. This is not the final setup. Some tasks may be added or modified at a later time when the required inputs become available.
No changes are expected for Run 3 workflows. Phase 2 workflows could have several endcap and preshower DQM and validation plots removed but the barrel ones should not be affected.
PR validation:
Passes limited matrix tests (except some file open errors) as well as WFs 34034.0 and ECAL Phase 2 development workflows 34034.61 and 34034.612.