Skip to content

Upgraded caddy version from 2.9.1 to 2.11.2.#845

Merged
cheeyanglee merged 1 commit intoopen-edge-platform:nextfrom
ssinghax:caddyUpgrade
Mar 31, 2026
Merged

Upgraded caddy version from 2.9.1 to 2.11.2.#845
cheeyanglee merged 1 commit intoopen-edge-platform:nextfrom
ssinghax:caddyUpgrade

Conversation

@ssinghax
Copy link
Copy Markdown
Contributor

Merge Checklist

All boxes should be checked before merging the PR

  • The changes in the PR have been built and tested
  • cgmanifest file has been updated if required
  • Ready to merge

Description

Upgraded caddy version from 2.9.1 to 2.11.2 to fix CVEs.

Any Newly Introduced Dependencies

No

How Has This Been Tested?

Manually tested.

 - caddy version upgraded to fix below CVEs,
    CVE-2026-27585, CVE-2026-27586, CVE-2026-27587
    CVE-2026-27588, CVE-2026-27589, CVE-2026-30852

Signed-off-by: Shalini Singhal <shalinix.singhal@intel.com>
@ssinghax ssinghax requested a review from a team as a code owner March 30, 2026 05:23
@cheeyanglee cheeyanglee merged commit 8df4ba8 into open-edge-platform:next Mar 31, 2026
12 of 18 checks passed
cheeyanglee added a commit that referenced this pull request Apr 3, 2026
This reverts commit 8df4ba8
and 404b813.

Signed-off-by: Lee Chee Yang <chee.yang.lee@intel.com>
cheeyanglee added a commit to cheeyanglee/edge-microvisor-toolkit that referenced this pull request Apr 3, 2026
@cheeyanglee
Copy link
Copy Markdown
Contributor

i have to revert this, something is wrong with this patch and it failed the build.
#861

cheeyanglee added a commit that referenced this pull request Apr 3, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants