Skip to content

Pull requests: openshift/vcf-migration-operator

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Assigned to nobody Loading
Sort

Pull requests list

SPLAT-2656: Surface migration progress, phase, timestamps, and Prometheus metrics approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#100 opened Aug 31, 2026 by jcpowermac Contributor Loading…
SPLAT-2653: Add OLM v1 File-Based Catalog support and deployment manifests approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#99 opened Aug 31, 2026 by jcpowermac Contributor Draft
Misc documents approved Indicates a PR has been approved by an approver from all required OWNERS files.
#95 opened Aug 20, 2026 by jcpowermac Contributor Loading…
Add finalizer-guarded deletion for VCFM to prevent interrupted migrat… approved Indicates a PR has been approved by an approver from all required OWNERS files.
#84 opened Jul 29, 2026 by jcpowermac Contributor Loading…
Distinguish transient from terminal condition failures approved Indicates a PR has been approved by an approver from all required OWNERS files.
#83 opened Jul 28, 2026 by jcpowermac Contributor Loading…
SPLAT-2913: Add fbc build pipeline approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#76 opened Jul 7, 2026 by AnnaZivkovic Contributor Loading…
WIP:SPLAT-2913: Set up FBC branch structure for vcf-migration-operator approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#75 opened Jul 7, 2026 by AnnaZivkovic Contributor Loading…
Add user and developer documentation approved Indicates a PR has been approved by an approver from all required OWNERS files.
#67 opened Jun 24, 2026 by jcpowermac Contributor Loading…
Add e2e test for vSphere multi-vCenter Day 2 using openshift-tests-ex… approved Indicates a PR has been approved by an approver from all required OWNERS files.
#66 opened Jun 24, 2026 by jcpowermac Contributor Loading…
ProTip! no:milestone will show everything without a milestone.