Phase 2-4: true event-driven watch, a ScheduledMachine.spec.spotSchedule reference now actually drives the machine's active/inactive decision (pull-on-reconcile)#83
Merged
DCO-2 / DCO
succeeded
Jun 15, 2026 in 1s
Check passed!
All commits are signed off, the check passed.
Summary
| Sha | Message | Pass or fail reason | |
|---|---|---|---|
| 🟢 | 605baab | Phase 1: add spotSchedule to CRD and move to v1bet... | Valid sign-off found |
| 🟢 | 1277d0c | Phase 2 and 3: true event-driven watch, a Schedule... | Valid sign-off found |
| 🟢 | 9a71e5a | Merge branch 'main' into spot-schedule-phase-2 | Skipped: sign-off not required in merge commit |
Loading