Skip to content

Phase 2-4: true event-driven watch, a ScheduledMachine.spec.spotSchedule reference now actually drives the machine's active/inactive decision (pull-on-reconcile)#83

Merged
ebourgeois merged 3 commits into
mainfrom
spot-schedule-phase-2
Jun 15, 2026

Merge branch 'main' into spot-schedule-phase-2

9a71e5a
Select commit
Loading
Failed to load commit list.
DCO-2 / DCO succeeded Jun 15, 2026 in 1s

Check passed!

All commits are signed off, the check passed.

Summary


Sha Message Pass or fail reason
🟢 605baab Phase 1: add spotSchedule to CRD and move to v1bet... Valid sign-off found
🟢 1277d0c Phase 2 and 3: true event-driven watch, a Schedule... Valid sign-off found
🟢 9a71e5a Merge branch 'main' into spot-schedule-phase-2 Skipped: sign-off not required in merge commit