Skip to content

Phase 2-4: true event-driven watch, a ScheduledMachine.spec.spotSchedule reference now actually drives the machine's active/inactive decision (pull-on-reconcile)#83

Merged
ebourgeois merged 3 commits into
mainfrom
spot-schedule-phase-2
Jun 15, 2026

Merge branch 'main' into spot-schedule-phase-2

9a71e5a
Select commit
Loading
Failed to load commit list.
GitHub Advanced Security / grype completed Jun 15, 2026 in 2s

2 configurations not found

Warning: Code scanning cannot determine the alerts introduced by this pull request, because 2 configurations present on refs/heads/main were not found:

Actions workflow (build.yaml)

  • ❓  grype-push-Chainguard
  • ❓  grype-push-Distroless

View all branch alerts.