March 2019 Morning Status Meetings
This page contains a brief summary of the status of the Xolotl development team each morning during the month of March 2019.
Sophie - Continuing on passing the GB locations from MOOSE to Xolotl and Testing the He-D-T grouping.
Sophie - Testing the He-D-T grouping and cleaning up the examples of Xolotl MOOSE coupling.
Sophie - Continuing to test new He-D-T groupings. Looking at the re-solution with Xe_n.
Sophie - Testing re-solution starting with a delay.
Sophie - Checking the status of the ITER runs. Testing the re-solution with the new rate.
Sophie - Trying the Kokkos branch of Xolotl. Looking at the highest reaction rates in the PSI network.
Sophie - Sending information to read HDF5 in Visit. Trying MOOSE coupling with irregular grid.
Sophie - Trying Kokkos on different machines. Continuing to run MOOSE coupling with more realistic parameter.
Sophie - Trying MOOSE coupling with different time steppers. Looking at the strange locations for ITER data.
Sophie - Continuing to try MOOSE coupling with different time steppers and analyzing the ITER data.
Sophie - Looking at the PISCES data for surface growth. Working on analyzing 1D MOOSE coupling data.
Sophie - Looking at XeRate and VacRate exchange data in MOOSE coupling.
Sophie - Setting up a simple case in 1D in MOOSE coupling to study grid and time stepping effect.
Sophie - Testing the grid and time stepping effects in 1D for MOOSE coupling. Working on the messy ITER simulations.
Sophie - Continuing to test the grid and time stepping effects in 1D for MOOSE coupling and preparing a presentation.
Sophie - Finishing the presentation on initial MOOSE coupling. Looking at the data/setup for the UCLA experiment.
Sophie - Looking at NE re-solution results and deuterium surface desorption.